Salty Sam’s Marina

Fort Myers Beach FL

Restoring Salty Sam's Marina After Hurricane Ian

Golden Marine Systems proudly supplied the floating dock system and gangways for Salty Sam’s Marina on Fort Myers Beach as part of the marina’s restoration following the devastation caused by Hurricane Ian in September 2022. The unprecedented storm surge and destructive force of the hurricane caused extensive damage throughout the marina, leaving much of the waterfront infrastructure destroyed. Recognized for its innovative and high-quality marina systems, Golden Marine Systems played a key role in helping restore this iconic destination and bring the facility back to operational status.
The new marina infrastructure features Golden Marine Systems’ advanced 850 Series floating dock system, engineered for long-term performance, durability, and resilience in demanding marine environments. The docks are outfitted with Endeck Ashwood composite decking, selected for its attractive appearance, low maintenance requirements, and exceptional resistance to weathering and wear. The system also incorporates 12-inch adjustable cleats, pile guides, and finger piers, providing a safe, flexible, and user-friendly docking experience for boaters. Designed with both functionality and longevity in mind, the dock system delivers a robust solution capable of withstanding the harsh conditions commonly associated with coastal waterfront environments.

More Projects: